Align the design basis
Confirm home, room, envelope, design conditions and load outputs used by each proposal.
Proposal normalizer
Compare design basis, exact models and capacity, distribution, electrical, backup, controls, permits, commissioning and warranty evidence.
Decision file
Confirm home, room, envelope, design conditions and load outputs used by each proposal.
List indoor and outdoor models, ratings, relevant capacity data, matched combinations and substitutions.
Compare ducts, indoor units, zoning, registers, returns, line routes, penetrations, condensate and restoration.
List assessments, circuits, service work, outdoor base, drainage, snow, sound and backup integration.
Compare permits where applicable, thermostats, integration, monitoring and owner training.
Require start-up and test records, settings, airflow or refrigerant documentation as applicable, manuals and warranty evidence.
Give every proposer the same room record, design assumptions, envelope plans, distribution evidence, electrical context and backup goals. Record calculation or sizing differences explicitly before ranking price or equipment.
List outdoor and indoor model pairing, low-temperature capacity, controls, backup integration, ducts or heads, drains, line sets, electrical work and outdoor mounting. Require current performance tables and written substitution review.
Compare permits, access, protection, penetrations, finish repairs, removal, schedule milestones and change rules. Handover should include tests, airflow or commissioning records, controls training, filter access, manuals, warranties and incentive documents.
Give each proposer the same room record, load and design assumptions, envelope plans, distribution evidence, electrical context, backup goals and outdoor-location constraints. Require the calculation method and revision, exact indoor and outdoor models, AHRI reference where applicable, and model-specific capacity at the reviewed winter temperatures. Compare ducts or heads, airflow or room delivery, controls, drains, line sets, electrical circuits and supplementary heat, outdoor mounting, permits, existing-system removal, access protection and finish repair. BC Hydro’s current heat-pump materials emphasize heat-load analysis, equipment qualification and contractor requirements for rebate routes; list those items separately from the base installation so an incentive assumption cannot hide missing design scope. Technical Safety BC identifies electrical permits for most residential heat-pump installations and possible gas or refrigeration requirements depending on the work and equipment; record the permit holder and closeout evidence rather than a generic “permits included” line. Define written substitution review because a different indoor or outdoor model can change capacity, efficiency, controls and program eligibility. Compare deposits, progress payments, tax treatment, exclusions, change authorization, equipment lead time and cancellation terms without labelling any price as typical. Assign wall opening, roof or grade work, weather sealing, fire stopping, condensate, old-equipment disposal and painting. Require commissioning records, airflow or static-pressure results where relevant, refrigerant or start-up documentation appropriate to the system, thermostat and backup settings, controls training, filter access, manuals, warranties and permit or inspection evidence at handover. Hold a proposal-leveling review against the same house brief and issue written answers for sizing, distribution, backup, electrical and outdoor-location differences. Incorporate accepted answers before equipment is ordered or an incentive application begins. The ledger prevents nominal tonnage, seasonal efficiency, a cold-climate label or a rebate estimate from standing in for a complete house-specific system.
Keep the installed price, possible rebate and estimated running cost on separate lines. BC Hydro describes its cost calculator as illustrative, using typical-home consumption and regional efficiency assumptions. The version reviewed October 12, 2026 assumes the heat pump meets all heating load without supplementary heat. Before applying that illustration to a proposal with backup heating, check when the backup is expected to operate and whether its energy use is included. If a proposal includes annual cost or savings, ask for the house-specific assumptions and calculation basis before treating it as a comparison. A capacity calculation, efficiency rating or rebate estimate is not by itself a forecast of the household bill.
BC Hydro cost calculator and published assumptions — reviewed October 12, 2026 →
Primary references
Official sources checked September 23, 2026. Applicability still depends on the property, equipment and proposed scope.